Project Solis

 Project Solis is a 1,000MWh on-grid Solar Photo Voltaic installation at Dutco labour camps in Jebel Ali, Dubai UAE, to reduce both utility costs and carbon emissions. The project aligns with the Dubai Integrated Energy Strategy 2030 and follows DEWA’s Shams initiative. The on−grid Solar PV System is fully integrated with the grid and is installed on the roof of 2 buildings and 6 blocks of the labour compound buildings. The installed capacity is around 600 KWHp, with an Annual Solar PV Production target of around 1,000MWh. GRFN was the supervising consultant to ensure the suitability of design and correctness of installation.

Client

Dutco Balfour Beatty

Location

Dubai, UAE

Type

Residential

Services

Renewables Consultancy; Energy Efficiency Consultancy