Burj Khalifa MEP Systems Redesign & Retrofit
2017 - 2020
There are few examples of buildings engineering design going beyond the wide spread applicable codes and standards. The design and construction of Burj Khalifa is definitely one of those examples. As part of the advanced and state-of-the-art predictive maintenance routines at the Burj, a project to retrofit the existing chilled water system supplying the top floors of the super tall building was commissioned. GRFN provided the engineering design and supervision of the retrofit which positioned the newly installed chillers system in the tower as the current highest chillers installation in the world.
Client
Emaar - Leaders Fort
Location
Dubai, UAE
Type
Mixed use
Services
Building Services Engineering; Construction Supervision